This is the complete Sub-part R Series - English AND Spanish - (thus 8 TOTAL VIDEOS ). Details below.

 

Video1: Fall Hazard Training

1. Defining the new Subpart-R OSHA Standard

2. Identifying Fall Hazards on the job site
· Proper ways to get on and off equipment
· Proper ways to get on and off trailers
· Dangers of shifting loads while unloading
· Dangers of slippery surfaces
· Tripping hazards
· Holes & opening

3. Fall Protection Systems used in steel erection; their requirements,
installation, maintenance, inspection and removal
· Personal fall arrest systems
· Anchorage point systems
· Guard rails and perimeter cables
· Safety nets
· Horizontal and vertical lifelines
· Positioning devices

Video2: Controlled Decking Zone Training

1. Defining the new subpart R OSHA Standard

2. Identifying CDZ Hazards on the job site
· Slippery surfaces
· Tripping hazards
· Holes & openings
· The leading edge
· Hoisting materials
· Joist failures
· Personal protective equipment requirements

3. CDZ Design & Layout Requirements
· Size
· Perimeter
· Access

4. Requirements & Procedures for Laying Deck
· Initial decking
· Secured & unsecured deck
· Openings & covers
· Column gaps
· Moving control lines
· Fall protection

5. Custody of Fall Protection

Video3: Multi-Lift Rigging Procedure Training

1. Defining the new subpart R OSHA Standard

2. Identifying Multi-lift Hazards on the job site
· Crushing or amputation injuries on the ground
· Rigging failure during hoisting
· Power lines
· Crane hand signals

3. Multi-lift Systems; their requirements, installation, maintenance,
inspection and removal
· Rigging equipment: wire rope slings, hooks & shackles
· Clean lay-down area
· Cribbing
· Storage/staging
· Personal protective equipment
· Specially designed Multi-lift rigging devices

4. Proper Procedures for Multi-lift Rigging
· Proper planning with beam list
· Determining load capacity
· Determining weight of a member
· Proper crane hand signals
· Safety rules for Multi-lift rigging
Maximum of 5 members
Seven foot rule
Wind limits
Safe route
Member restrictions
Crane requirements
· Marking centerlines
· Use of tag line

Video4: Connector Training

1. Defining the new Subpart-R OSHA Standard

2. Identifying Hazards for connectors
· Hazards of slippery surfaces
· Tripping hazards
· Personal fall protection systems
· Sorting
· Hoisting
· Double connections
· Crane hand signals

3. Proper Procedures for Connecting
· Setting columns
· Making connections including safety seats & staggered clips
· Double connection requirements
· Filler beams
· Column splices